T R A C K       P A P E R
ISSN:2394-3661 | Crossref DOI | SJIF: 5.138 | PIF: 3.854

International Journal of Engineering and Applied Sciences

(An ISO 9001:2008 Certified Online and Print Journal)

Research on Schedule Management of Shipyard Based on Task Package

( Volume 6 Issue 4,April 2019 ) OPEN ACCESS
Author(s):

Ke Gao, Xiaoping Ma

Abstract:

To solve the problem of how to effectively manage the progress of the ship during the ship construction process. Based on the task package, this paper analyzes and studies the shipyard operation schedule management method, and focuses on the schedule planning process and schedule management method based on the task package construction process to achieve the full process management of the ship's operation progress. Finally, effective control over the deviation of the ship construction schedule will be realized to ensure delivery on time.

DOI DOI :

https://dx.doi.org/10.31873/IJEAS/6.4.2019.23

Paper Statistics:

Total View : 749 | Downloads : 740 | Page No: 67-71 |